KVARSince 1988

Deployed · hardware and software

Rejections tied to a line, a shift and an operator.

In service: Automotive, pharma and packaging production

The problem

Inspection results lived on paper checklists. Rejections were counted at the end of the shift, and by then it was impossible to tie them back to a line, a shift or an operator.

What we installed

Rejections are counted as they happen alongside production, and inspection is captured against a checklist, so quality is reported per line and per shift rather than as one monthly number.

Related: Production & OEE

HARDWARE
Production counter display with rejection count · panel instruments · in-process test interfaces
SOFTWARE
KLOG Cloud quality dashboard · QC checklists · per-shift rejection reports
FUNCTION
Quality & inspection
INDUSTRIES
Automotive & electronics, pharma & food, FMCG & packaging

About this case study

The system described is in service. The client’s name is withheld by agreement; a reference can be arranged once a conversation is under way.

Related deployments

All case studies

Recognise this problem? Tell us about yours.

Start a conversation