Promise dates calculated from capacity, not guessed.

In service: Electronics and assembly manufacturing, order book to shop-floor plan

The problem

The plan lived in a spreadsheet and in the planner’s head. Nobody could say what the factory could actually take on, which orders were late, or what happened to everything else when one urgent order jumped the queue.

What we installed

The order book is planned against real capacity. Each order is costed in stage times, scheduled against the hours the teams actually have, and released to the floor as clockable work — so a promise date is calculated, and the effect of an urgent order is visible before it is accepted.

Related: Production Genie

HARDWARE
Runs on existing PCs and tablets; pairs with KVAR shop-floor displays and Andon so the plan reaches the operator
SOFTWARE
Production planning suite — capacity and load board, planning queue, worker allocation, completion forecast, dispatch scheduling, cost per order
FUNCTION
Planning & scheduling
INDUSTRIES
Automotive & electronics, aeronautics & defence, pneumatics, FMCG & packaging

What changed

Capacity-basedpromise dates
Order-leveltraceability
Plan to flooron one platform

About this case study

The system described is in service. The client’s name is withheld by agreement; a reference can be arranged once a conversation is under way.